One sheet for the whole permitted job. Fill in the rough, record the backfill
once the rough has passed, then close out the final. Tap Print / Save as PDF for the
job file. The draft stays on this phone if you lose signal.
1 The job
2 Rough inspection — before anything is covered
3 Backfill — after the rough passes
Nothing gets covered before the rough is signed offSet the rough result above to Passed (or Passed with corrections) before recording
the backfill, and photograph the open trench first.
4 Final inspection and turn-on
Open trench, tracer wire, riser, tank
set, regulator, gauge readings, the finished grade.
Nothing leaves this page except the photos, which go to
the office when there is signal.
Tank Installation Inspection Record
Rough · Backfill · Final
Gas Solutions Plus LP Gas License #LI100065 561-907-4301
Rough inspection Not inspected yet
Backfill Trench still open
Final inspection Not inspected yet
Photos
Installer / qualifier — signature & date
AHJ inspector — name & date
Customer — signature & date
Installed and tested by Gas Solutions Plus, Florida licensed LP gas contractor
#LI100065. Underground piping is not to be covered until the rough inspection has been signed
off. Keep this record with the permit file.