Nameplate BTU/hr of every appliance, present and future, from the data plate or Spec Sheet — not a guess. The tables are in thousands (MBH): 364,000 BTU/hr = 364 MBH.
From the second-stage regulator to the farthest appliance, along the pipe. Use the length row at or above it. A 55 ft run uses the 60 ft row, never the 50.
Schedule 40 at 11" WC. On your length row, read across until the capacity meets or beats the total load. That size is the main.
Each branch on its own appliance load, still on the longest-run row — even a 6 ft branch. That is the longest-length method, and it keeps the drop at the far end inside ½" WC.
Page 1: the smallest Marshall Excelsior unit whose rating covers the total load. 364 MBH → MEGR-1222-BAF (500,000). 600 MBH → MEGR-1622-BCF (710,000).
PE at 10 PSIG, same total load, length from first stage to second stage. Then the first stage: MEGR-1122H-AAJ covers up to 1,000,000; the full-size 1622H models are for loads above that.
Between rows, take the longer one. Short-cutting the row is the most common sizing error.
If the load equals a capacity (231 MBH on ¾"), go up a size. ½" WC of drop is the limit, not the target.
Size for the pool heater or generator the customer says is coming. Re-piping later costs more than a size up now.